Home | News | Lindley builds a floating dock to dock the fleet of the GNR Fiscal Brigade in the Eastern Algarve
Lindley builds a floating dock to dock the fleet of the GNR Fiscal Brigade in the Eastern Algarve
02-04-2014
The project, awarded in December 2013 and completed in February 2014, included the design, manufacture and assembly of a floating dock for vessels up to 22m. This pier is made up of concrete pontoons from the PFC (Continuous Floating Pontoon) range consisting of 12x2.5m and 15x2.5m modules tied by metal poles. The restricted access to this pier is made by a metal bridge with 14x1m and by a gate equipped with an access control system by means of magnetic cards. The quay is equipped with water and electricity supply services to the vessels, as well as means of fire fighting (chemical powder extinguishers) and emergency (ringing ring, emergency ladder and first aid box). The continuously floating concrete pontoons that have been installed are part of the PFC range, a robust solution designed for mooring and mooring heavy medium and large vessels.